Welcome Guest! To enable all features please Login or Register.

Notification

Icon
Error

Login


Take the time to read our Privacy Policy.

nineteenfortyeight Offline
#1 Posted : Friday, 4 January 2019 4:16:04 PM(UTC)
nineteenfortyeight

Rank: Member

Reputation:

Groups: Registered
Joined: 7/09/2016(UTC)
Posts: 77
Man
Australia
Location: Blackbutt Queensland

Thanks: 9 times
The motor and box are out of the Van and the sub frames are finally off and suspension separated from it. The inner bolts were a pain to get out without destroying them or the surrounding panels. A lot of heat from a Red Devil Propane Torch and a lot of Inox and patience and eventually, out they came.
The bottom of the drivers side door pillar is done as is the 2 front guards, both doors as well as the drivers side rain channel. It also had a hole in the DS Rear Quarter where an LPG Plug was fitted. The LPG is long gone and the hole had been repaired poorly. It is repaired properly now.
The sub frames require a lot of work where they bolt on at the top sides of the fire wall. However the fire wall panels only have one hole each about an inch in diameter. Easy repair (for a panelbeater?)
More to come as work progresses.
Cheers,
Ron
48 215
Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2019, Yet Another Forum.NET
This page was generated in 0.061 seconds.